IESASP Logo
IESASP
IESASP Logo
IESASP
II
Flow Layer
Flow Layer

liquid

CODNTUORPDOFeMnNH₃–N

Flüssigkeitssystempolitik

Regulierungsrahmen

  1. Public Utilities Board (PUB) Catchment Policy: Two-thirds of Singapore’s land acts as a catchment area (approx. 66%) → Rainfall is converted into national water resources.
  2. Public Utilities Board (PUB) Service Reservoirs: Land is allocated for water storage → Supports large-scale populations (e.g., 100k); water distribution networks store water at high elevations to achieve gravity-fed, pressurized supply town-wide.
  3. Public Utilities Board (PUB) Drainage Development: Stormwater drainage systems achieve rapid runoff removal to prevent flooding, making low-lying areas viable for development.
  4. Public Utilities Board (PUB) Active, Beautiful, Clean Waters (ABC Waters Program): Slows, treats, and purifies storm runoff; requires land to include bioretention systems to reduce peak flow and improve water quality. A specific percentage of rainfall is retained/treated locally rather than directly discharged.
  5. Public Utilities Board (PUB) Deep Tunnel Sewerage System (DTSS): Uses deep underground tunnels (depths of -20 to -50 meters) to collect wastewater → Centralized treatment releases surface land and enhances wastewater treatment capacity, allowing high-density living without local treatment plants.
  6. National Water Strategy (Public Utilities Board): Diversification of supply sources into “Four National Taps” → Enhances supply resilience (Local Catchment + Imported Water + NEWater + Desalinated Water).
  7. Singapore Green Plan 2030: Sustainable water management; strengthening water recycling, efficiency, and integration → Supporting closed-loop water cycles.
  8. Housing & Development Board (HDB) Sustainable Design: Centralised Cooling Systems (CCS) reduce the water-energy load → Decreasing cooling-related water consumption compared to traditional systems.
  9. Public Utilities Board (PUB) Drainage Standards: Land must be elevated or shaped → Ensures correct runoff flow → Reducing flood risk below defined thresholds.

Empirische Belege

Projektfälle (3)

1

Empirischer Fall

Guangdong Dongbian River: Water Environment Restoration and Operations & Maintenance (2019)

Abgeleiteter Standard: COD (Chemical Oxygen Demand), NTU (Nephelometric Turbidity Units), ORP (Oxidation-Reduction Potential), DO (Dissolved Oxygen)

① (P) Primal Perception: UAV remote sensing and GIS-based sensing

② (A) Analogy: Establish a spatiotemporal correlation knowledge base and information database associated with Dongbian River, integrated with EAVC (Energy Anchored Value Consensus)

③ (D) Derivative: Water environment remediation framework based on value consensus

④ Integration based on D:

  • a) Algae specialists
  • b) Chemistry specialists
  • c) Finance specialists
  • d) Certified testing laboratories (with statutory qualifications)
  • e) Equipment and facilities manufacturing teams
  • f) Engineering implementation teams

Mosaic horizontal division of labour: work orders, payment vouchers

  • a) Continuous data collection (TDS (Total Dissolved Solids), pH)
  • b) Solution design: equipment and facility blueprints, material formulations, structural design, and testing
  • c) Laboratory testing: microbial cultivation, physical flocculation robotics work reports
  • d) Derived cost calculation: Dongbian River budget
  • e) Material composition testing: test reports
  • f) Equipment calibration testing: calibration certificates
  • g) Application results: work reports
  • h) Equipment and facility iterative development: work reports
2

Empirischer Fall

Nanjing Qinhuai River Basin Research and Evaluation (2022)

Abgeleiteter Standard: Iron (Fe), Manganese (Mn)

① (P) Primal Perception: UAV remote sensing and GIS-based sensing, multispectral optical sensing of the Qinhuai River Basin (10 × 10 cm resolution)

② (A) Analogy: Establish a spatiotemporal correlation knowledge base and information database associated with the Qinhuai River, integrated with EAVC (Energy Anchored Value Consensus)

③ (D) Derivative: Water environment research and evaluation framework based on value consensus

④ Integration based on D:

  • a) Senior environmental specialists
  • b) Chemistry specialists
  • c) Economics specialists
  • d) Electronics and information specialists
  • e) Microbial cultivation specialists
  • f) Vehicle design and manufacturing teams
  • g) Certified testing laboratories (with statutory qualifications)
  • h) Model design and testing teams

Mosaic horizontal division of labour: work orders, payment vouchers

  • a) Professional workshops on Qinhuai River water environment remediation
  • b) Derivative solution design based on P and A: research and evaluation framework
  • c) Laboratory prototype testing: microbial cultivation work reports, material testing work reports
  • d) Field articulated-module testing: work reports
  • e) Derived cost calculation
  • f) R&D material testing: test reports
3

Empirischer Fall

Beijing Future Living Project (Post-Industrial City Prototype)

Abgeleiteter Standard: NH₃–N (Ammonia Nitrogen)

① P — Primal Perception:

  • a) Spatial sensing of “Future Living” (air, wind, water, soil, plants, animals, nutrients)
  • b) Aerial remote sensing to acquire GIS features

② A — Analogy: Establish a spatiotemporal correlation knowledge base and information database for “Future Living,” integrated with EAVC (Energy Anchored Value Consensus)

③ D — Derivative: Framework for the “Future Living” solution

④ Integration based on D:

  • a) Energy systems specialists
  • b) Architectural design specialists
  • c) Materials specialists
  • d) Electronics and information specialists
  • e) Certified testing laboratories (with statutory qualifications)

⑤ Through mosaic horizontal division of labour:

  • a) Underground water storage structure for “Future Living”: work reports and drawings
  • b) High-capacity underground water storage layer based on A-design: storm response work reports
  • c) Design and testing of water supply and drainage systems: work reports and drawings
  • d) Provision of material testing reports and system testing reports: test reports

Schichtsystem

Flow Layerliquid

Flow Layer